Request for Proposals: Gray Public Library Generator Electrical Construction
Bids are due September 7, 2023.
Posted on: August 22, 2023 - 9:04am
The Town of Gray is seeking proposals from qualified Electrical Contractors to furnish, install, and terminate connections to a Kohler 100kw LP Generator and install the supplied 400-amp automatic transfer switch. Submissions are due by September 7 at 12 p.m.
The scope of work includes:
- Install and connect supplied Automatic Transfer Switch (coordinate with Central Maine Power to make connections between the meter enclosure and the transfer switch. This work must be scheduled on a Monday as the Library is closed).
- Furnish and install all conduit and conductors from transfer switch to generator pad including communication wires and charging circuit. (Generator pad is approximately 135’ from meter.)
- Install any applicable circuits into main electrical panel.
- Attend start up with Mid Maine Generator.
- Pull State Permit.
Questions and requests for clarification regarding this RFP must be directed via email to mrusso@graymaine.org. A site walk can be scheduled Monday through Friday from 9:00 a.m. to 1:00 p.m. The full RFP can be found here.